石材幕墙工程监理实施细则

监理实施细则

(石材幕墙工程)

编制人: 审核人:

编制单位:奉化市凯远工程咨询有限公司 编制时间:2010年5月20日

目 录

一、工程概况 ················································································································ 2 二、监理细则依据 ········································································································ 2 三、幕墙工程施工质量保证条件 ················································································ 2 四、幕墙工程监理程序 ································································································ 3 五、幕墙材料 ················································································································ 4

1. 2. 3. 4.

钢材 ·············································································································· 4 石材 ·············································································································· 4 建筑密封材料 ······························································································ 5 其他材料 ······································································································ 7

六、幕墙设计和施工阶段监理要点 ············································································ 7 七、幕墙工程的制作与安装 ························································································ 8

1. 2. 3. 4. 5.

“施工组织设计”的审查要点 ·································································· 8 审查、确认进场材料 ·················································································· 8 幕墙材料制作加工 ······················································································ 9 幕墙工程的安装施工 ················································································ 11 幕墙的性能试验 ························································································ 12

八、幕墙工程验收 ······································································································ 13

1. 2.

工程现场验收 ···························································································· 13 工程提交资料验收 ···················································································· 15

一、工程概况

本工程位于 。总建筑面积172324.64m2,由 组成。其中 。均为钢筋混凝土剪力墙结构。外墙装饰大部分采用外挂石材幕墙。根据本工程特点外立面设计装饰效果要求较复杂,施工有一定难度,所以幕墙子分部工程由 幕墙有限公司分包。计划工期 天。

二、监理细则依据

本细则根据以下有关规范、标准制定:

1、 建筑装饰装修工程质量验收规范 (GB50210—2001) 2、 金属与石材幕墙工程技术规范 (JGJ133—2001) 3、 建筑用硅酮结构密封胶 (GB16776) 4、 建筑幕墙物理性能分级 (GB/T15225) 5、 建筑幕墙风压变形检测方法 (GB/T15227) 6、 建筑幕墙雨水渗漏性能检测方法 (GB/T15228) 7、 建筑幕墙空气渗透性能检测方法 (GB/T15226) 8、 铝合金建筑型钢 (GB/T 5237.2—5237.5) 9、 天然石材产品放射性防护分类标准 10、 其他有关国家标准。

三、幕墙工程施工质量保证条件

1、幕墙设计必须由相应资质的设计单位承担。设计应严格执行国家相关规范。 2、幕墙工程所用材料:钢材及不锈钢、石材、粘结密封胶等均须有出厂合格证,并符合国家和行业标准。

3、加工制作所使用的材料和配件、加工质量等均应符合国家和行业标准、技术规程。

4、幕墙施工必须由相应资质的施工单位进行施工安装,安装工艺及质量应符合国家现行标准。幕墙工程的设计、材料、

JGJ133—2001、《建筑装饰装修工程质量验收规范》工程监理程序

五、幕墙材料

1. 钢材

①幕墙工程所使用的不锈钢宜采用奥氏体不锈钢材,型材材质应符合相应的现行国家标准:不锈钢棒(GB1200)、不锈钢冷轧钢板(GB3280)、不锈钢热轧钢板(GB4237)。

②普通钢筋HPB235是应用最多的钢材,使用时应对其试验报告中的化学成份, 力学性能等重点审查。

③幕墙工程中使用的钢材、五金件应有出厂合格证、试验报告,热镀锌涂层必须合格。

④钢结构幕墙高度超过40M时,钢构件宜采用高耐候结构钢,并应在其表面涂刷防腐涂料。

⑤钢构件采用冷弯薄壁型钢时,其壁厚不得小于3.5mm,强度应符合设计计算要求,表面应进行处理。 2. 石材

① 幕墙石材宜选用火成岩。

② 石材的弯曲强度不应小于8.0MPa,吸水率应小于0.8%。

③ 石材幕墙的铝合金挂件厚度不应小于4.0mm,不锈钢挂件厚度不应小于3.0mm。

④ 火烧石板与抛光石板若要求同强度时,火烧石板的厚度应比抛光石板厚3mm。

⑤ 石材的强度,弯曲强度、耐磨性、耐酸性、体积密度、吸水率等主要性能试

验应符合国家相应标准规定。 3. 建筑密封材料 ① 密封胶带

(1)密封胶条必须符合相应规范规定。玻璃幕墙采用的橡胶制品宜采用三元乙丙橡胶,氯丁橡胶。

(2)双面密封胶带的选用应根据工程所在地的风荷载、高度,幕墙面积大小来确定。当风荷载大于1.8KN/m2时玻璃幕墙宜选用中等硬度的聚胺基甲酸乙酯低发泡间隔双面胶带。当风荷载小于或等于1.8KN/m2时,宜选用聚乙烯低发泡间隔双面胶带。

(3)胶条的厚度应比结构胶厚度大1mm。 ② 耐候硅酮密封胶

(1) 耐候密封胶应具有耐水、耐溶剂、耐大气老化、低温弹性,低透气率等性能。其性能应符合标准《建筑窗用弹性密封剂》JC485之规定。 (2) 耐候硅硐密封胶必须是中性胶,禁止使用酸性胶。

(3) 耐候硅硐密封胶的使用必须在有效期内,不得使用过期的耐候胶。 (4) 耐候胶不得用结构硅酮胶代替使用。 (5) 石材用密封胶应具有耐污染性试验报告。

(6) 耐候硅酮密封胶应经检验合格后,方可使用,其性应符合下表之规定。

③结构硅酮胶

(1) 结构硅酮胶应符合国内标准《建筑用硅酮结构密封胶》GB16776。 (2) 结构硅酮胶应采用高模数中性胶,胶的性能应符合下表规定。

(3) 结构硅胶与相接触材料的相容性必须经专门性试验(进口材料均应进行

实验),且检测合格。

(4) 材料的粘接拉伸强度试验试件,应为“H”型试件。试验送 检样品,除结构硅酮胶样品外,同时还应送与之相粘接的材料(如铝合金型材,玻璃等)。其粘接破坏必须100%发生在胶体内部,即规定内聚力破坏率达100%。而不是发

生在两种材料的交界面上。

(5) 结构胶应有出厂合格证、产地证书、相容性试验、剥离粘接强度检测报告、物理耐用年限和保险年限的质量证书、使用有效期等。进口硅酮结构胶还应具有商检证。

(6) 不得使用超过有效期的结构硅酮胶。

(7) 结构硅酮密封胶宜选用耐紫外线性能强的黑色结构硅酮密封胶。 4. 其他材料

(1) 幕墙的填充材料密度应符合设计要求。

(2) 隔热保温材料(岩棉、矿棉、玻璃棉、防火板等)其难燃性、密度、强度等性能应符合国家相应标准。同时应采用铝箔或塑料薄膜包装的复合材料作为防水和防潮材料。

(3) 膨胀螺栓应有出厂合格证,进场后必须作抗拔力试验,合格后方可使用。

六、幕墙设计和施工阶段监理要点

1、幕墙设计必须由有设计资格的单位承担。

2、 监理重点为幕墙设计的安全性,防火设计、防雷设计等涉及幕墙安全的部分。 3、 幕墙主要构件必须悬挂在主体结构上,不承受主体结构的荷载,只承受其本身的荷载,按围护结构设计。

4、 所有构件和连接件应具有足够的承载力、刚度和相对于主体结构的位移能力。

5、 按相应的抗震设防能力、风荷载、温度作用进行设计。在风荷和小震 下不应破损;在设防烈度地震作用下,经修理仍能使用;在大震下骨架不应脱落。 6、 幕墙的风压变形、雨水渗漏、空气渗透、平面内变形四项性能为幕墙的基本性能,必须进行试验且合格。保温性能、隔热性能、耐撞击性能应根据工程的使用功能和业主的要求进行选择试验。

7、 防火设计必须符合防火规范要求。玻璃分隔不宜跨越两个防火区,幕墙与每层楼板、隔墙处的间隙应采用不燃烧材料填充。

8、 立面分格不宜过大,同一分格区不能上下或左右跨越两个防火单元。

9、 无窗下墙时,楼面外墙应有高度为800mm的实体部分,否则,应采取其他防火措施。

10、防火层应采取隔离措施,并应根据防火材料的耐火极限决定防火层的厚度和宽度,且应在楼板处形成防火带。

11、幕墙防火层必须采用经防腐处理且厚度小于1.5mm的钢板,不得采用铝板。 12、防火层的密封材料应采用防火密封胶。

13、防雷设计应符合《建筑物防雷设计规范》GB50057的有关规定,幕墙应形成自身的防雷体系,并应与主体结构的防雷体系可靠地连接。

七、幕墙工程的制作与安装

1. “施工组织设计”的审查要点

监理应着重审查幕墙工程“施工组织设计”中下表之内容。

2. 审查、确认进场材料

①施工单位一般应提交以下资料: • 进口材料均应提交商检报告

•产地证明、出厂合格证、性能检验报告、装船证明(进口时) • 结构胶产地证明、装船证明、有效期限证明 • 结构胶相容性试验

• 结构胶粘接力测试报告

²石材用密封胶的耐污染性试验报告 • 石材化学成份试验报告 • 石材力学性能试验报告 ²石材冻融性试验报告 • 石材胶渗油试验报告 • 钢材化学成份报告 • 钢材力学性能报告 • 膨胀螺栓出厂合格证 • 膨胀螺栓抗拔试验报告

• 耐候胶产地证明、商检证(进口时) • • ②确认进场材料

• 凡进场材料均应经几方见证取样,送有关单位进行试验合格后,方可进场使用。 • 进场材料必须与施工合同、标底、报送的技术资料、审批的施工组织设计相符合。

• 进场材料必须和送检样品相一致。

• 凡开箱材料,构件必须经几方共同验收,并留照片存档。 • 现场加工场地,堆放场地必须准备就绪。 3. 幕墙材料制作加工

⑴幕墙材料和构件加工分现场和厂内加工,监理工程师必须认真监督,这是保证幕墙质量的关键工序。厂内加工时,若监理合同有规定,应派专职人员进厂定时或不定时的进行监理。 ⑵板的制作加工

²石板连接部位应无崩坏、暗裂等缺陷;其他部位崩边不大于5mm³20mm,或缺角不大于20mm时可修补后使用,但每层修补的石板块数不应大于2%,且宜用于立面不明显部位;

²石板的长度、宽度、厚度、直角、异型角、半圆弧形状、异型材及花纹图案造型、石的外形尺寸均应符合设计要求;

²石板外表面的色泽应符合设计要求,花纹图案应按样板检查。石板四周围不得有明显的色差;

²火烧石应按样板检查火烧后的均匀程序,火烧石不得有暗 裂、崩裂情况; ²石板的编号应同设计一致,不得因加工造成混乱;

²石板应结合其组合形式,并应确定工程中使用的基本形式后进行加工; ²石板加工尺寸允许偏差应符合现行行业标准《天然花岗石建筑板材》(JC205)的有关规定中一等品要求。

钢销式安装的石板加工应符合下列规定:

²钢销的孔位应根据石板的大小而定。孔位距离边端不得小于石板厚度的3倍,也不得大于180㎜;钢销间距不宜大于600㎜;边长不大于1.0m时每边应设两个钢销,边长大于1.0m时应采用复合连接;

²石板的钢销孔深度宜为22~33㎜,孔的直径宜为7~8㎜,钢销直径宜为5~6㎜,钢销长度宜为20~30㎜。

²石板的钢销孔处不得有损坏或崩裂现象,孔径内应光滑、洁净。 通槽式安装的石板加工应符合下列规定:

²石板的通槽宽度宜为6㎜或7㎜,不锈钢支撑板厚度不宜小于3.0㎜,铝合金支撑板厚度不宜小于4.0㎜;

²石板开槽后不得有损坏或崩裂现象,槽口应打磨成45°倒角;槽内应光滑、洁净。

短槽式安装的石板加工应符合下列规定:

²每块石板上下边应各开两个短平槽,短平槽长度不应小于100㎜,在有效长度内槽深度不宜小于15㎜;开槽宽度宜为6㎜或7㎜;不锈钢支撑板厚度不宜小于3.0㎜,铝合金支撑板厚度不宜小于4.0㎜。弧形槽的有效长度不应小于80㎜。

² 两短槽边距离石板两端部的距离不应小于石板厚度的3倍且不应小于85㎜,也不应大于180㎜。

²石板开槽后不得有损坏或崩裂现象,槽口应打磨成45°倒角,槽内应光滑、

洁净。

²当石板的转角支撑采用不锈钢支撑件组装时,不锈钢支撑件的厚度不应小于3㎜;

²当石板的转角支撑采用铝合金型材专用件组装时,铝合金型材壁厚不应小于4.5㎜,连接部位的壁厚不应小于5㎜。 ⑶石材构件检验

²石材幕墙构件应按同一种类构件的5%进行抽样检查,且每种构件不得少于5件。当有一个构件抽检不符合上述规定时,应加倍抽样复验,全部合格后方可出厂。

²构件出厂时,应附有构件合格证书。

²幕墙构件若在厂内加工,且监理合同有要求时,专业监理工程师应驻厂监理或专人不定期进厂监理。

4. 幕墙工程的安装施工 ①可进行幕墙施工的先决条件: • 主体结构已达到验收规范的要求。

• 现场已清理,土建脚手架已拆除。污染幕墙施工的工序已完,若未完也已采取保护措施,达到幕墙施工要求。 • 有加工、堆放场地。

• 1∶1实际采用的幕墙样板已认可。 • 构件、材料、零附件已认可验收。

• 主体上的予埋件应在主体施工时按设计要求埋设。预埋件应牢固,位置准确,预埋件的位置误差应按设计要求进行复查。若标高偏差>10㎜,位置差>20㎜,则应采取补救措施。

·若有变更,是否已经设计院、业主、监理认可,并有相应的技术文件。 • 幕墙安装的基准线已设定,认可。

• 关键工序的技术人员及技工的岗位合格证书已具备。

②石材幕墙安装质量见下表

③监理着重检查项目

④幕墙隐蔽项目验收应包括: ²预埋件(或后置埋件)

• 幕墙构件与主体结构的连接节点安装 • 幕墙与建筑四周间隙处理 • 幕墙防火构造

• 伸缩缝、沉降缝及墙面转角处的构造节点 • 防雷装置

5. 幕墙的性能试验

• 一般幕墙面积超过10000m2均应进行物理性能试验。性能试验包括七项内容:

雨水渗漏试验(GB/T15228—94)、空气渗透试验(GB/T15226—94)、风压变形试验(GB/T15227—94)、平面内变形性能试验,这四项内容为基本实验项目,必须进行。保温性能试验(GB8484—87)、隔音性能试验(GB8485—87)、耐撞击性能试验这三项内容是在必要时或应业主要求时进行的试验。 • 试验试件由承包商制作,监理按规定监督实施。 • 性能试验应在具备资格的试验单位进行。

• 承包商在委托试验之前,应编制“试验计划”,计划中应明确规定试验内容、方法、程序、进度、合格标准等,并应得到业主、监理的认可。

• 进行试验时,三方应在场,若不能在场,试验方应保证出具具有法律效力的报告,报告必须公正、客观、真实。

• 物理性能试验报告是竣工资料的重要组成部分。

八、幕墙工程验收

幕墙工程涉及安全的项目,必须单独进行专项检查验收。 1、 现场验收

① 达到验收条件后,监理应组织设计、业主、施工等单位进行初验,列出整改清单,监督施工单位逐条消项。 ② 参与幕墙工程的竣工验收。

③ 验收应在施工完毕、脚手架拆除、剥去全部保护材料、进行清洗整体、幕墙外露后进行。

④ 幕墙的所有立面均应进行验收,可依一个大面作为基本单元进行验收。 ⑤抽查频率:每500-1000平方米为一个检验批,每个检验批每100平方米至少抽查一处,每处不少于10平方米。 石材幕墙工程验收应按如下项目进行验收: 主控项目:

(1)石材幕墙工程所用材料的品种、规格、性能和等级,应符合设计要求及国家现行产品标准和工程技术规范的规定。石材弯曲强度不应小于8.0MPa;吸水

率应小于0.8%。石材幕墙的铝合金挂件厚度不应小于4.0mm,不锈钢挂件厚度不应小于3.0mm。检查产品合格证书、性能检测报告、材料进场验收记录和复验报告。

(2)石材幕墙的造型、立面分格、颜色、光泽、花纹和图案应符合设计要求。 (3)石材孔、槽的数量、深度、位置、尺寸应符合设计要求。

(4)石材幕墙主体结构上的预埋件和后置埋件的位置、数量及后置埋件的拉拔力必须符合设计要求,检查拉拔力检测报告和隐蔽工程验收记录。

(5)石材幕墙的金属框架立柱与主体结构预埋件的连接、立柱与横梁的连接、连接件与金属框架的连接、连接件与石材面板的连接必须符合设计要求,安装必须牢固。

(6)金属框架和连接件的防腐处理应符合设计要求。

(7)石材幕墙的防雷装置必须与主体结构防雷装置可靠连接。

(8)石材幕墙的防火、保温、防潮材料的设置应符合设计要求,填充应密实、均匀、厚度一致。

(9)各种结构变形缝、墙角的连接节点应符合设计要求和技术标准的规定。 (10)石材表面和板缝的处理应符合设计要求。

(11)石材幕墙的板缝注胶应饱满、密实、连续、均匀、无气泡,板缝宽度和厚度应符合设计要求和技术标准的规定。

(12)石材幕墙应无渗漏。查验在易渗漏部位的淋水试验。 一般项目:

(1)石材幕墙表面应平整、洁净,无污染、缺损和裂痕。颜色和花纹应协调一致,无明显色差, 无明显修痕。

(2)石材幕墙的压条应平直、洁净、接口严密、安装牢固。

(3)石材接缝应横平竖直、宽窄均匀;阴阳角石板压向应正确,板边合缝应顺直;凸凹线出墙厚度应一致,上下口应平直;石材面板上洞口、槽边应套割吻合,边缘应整齐。

(4)石材幕墙的密封胶缝应横平竖直、深浅一致、宽窄均匀、光滑顺直。 (5)石材幕墙上的滴水线、流水坡向应正确、顺直。

(6)每平方米石材的表面质量和检验方法应符合下表的规定。

(7)石材幕墙安装的允许偏差和检验方法应符合下表的规定。

2、工程提交资料验收

1、项目监理处应对以下资料进行审查: ① 设计竣工图。

② 结构计算书、设计文件、设计修改、材料代用文件。 ③ 各种材料、构件出厂合格证及各种试验报告(如前述) ④ 施工自检记录。 ⑤ 隐蔽验收记录。

⑥ 各种进口材料的商检报告。

⑦ 正常情况下物理耐用年限质量保证书。

⑧ 各种施工安装质量监测文件:照片、录像带、洽商记录、 施工安装测评记录。 ⑨ 幕墙物理性能试验报告。

2、幕墙使用期间每年应进行维护清洗,5年进行全面检查一次。

3、幕墙工程竣工资料单独整理,最终并入单位工程“建筑装饰装修工程分部”之中。

监理实施细则

(石材幕墙工程)

编制人: 审核人:

编制单位:奉化市凯远工程咨询有限公司 编制时间:2010年5月20日

目 录

一、工程概况 ················································································································ 2 二、监理细则依据 ········································································································ 2 三、幕墙工程施工质量保证条件 ················································································ 2 四、幕墙工程监理程序 ································································································ 3 五、幕墙材料 ················································································································ 4

1. 2. 3. 4.

钢材 ·············································································································· 4 石材 ·············································································································· 4 建筑密封材料 ······························································································ 5 其他材料 ······································································································ 7

六、幕墙设计和施工阶段监理要点 ············································································ 7 七、幕墙工程的制作与安装 ························································································ 8

1. 2. 3. 4. 5.

“施工组织设计”的审查要点 ·································································· 8 审查、确认进场材料 ·················································································· 8 幕墙材料制作加工 ······················································································ 9 幕墙工程的安装施工 ················································································ 11 幕墙的性能试验 ························································································ 12

八、幕墙工程验收 ······································································································ 13

1. 2.

工程现场验收 ···························································································· 13 工程提交资料验收 ···················································································· 15

一、工程概况

本工程位于 。总建筑面积172324.64m2,由 组成。其中 。均为钢筋混凝土剪力墙结构。外墙装饰大部分采用外挂石材幕墙。根据本工程特点外立面设计装饰效果要求较复杂,施工有一定难度,所以幕墙子分部工程由 幕墙有限公司分包。计划工期 天。

二、监理细则依据

本细则根据以下有关规范、标准制定:

1、 建筑装饰装修工程质量验收规范 (GB50210—2001) 2、 金属与石材幕墙工程技术规范 (JGJ133—2001) 3、 建筑用硅酮结构密封胶 (GB16776) 4、 建筑幕墙物理性能分级 (GB/T15225) 5、 建筑幕墙风压变形检测方法 (GB/T15227) 6、 建筑幕墙雨水渗漏性能检测方法 (GB/T15228) 7、 建筑幕墙空气渗透性能检测方法 (GB/T15226) 8、 铝合金建筑型钢 (GB/T 5237.2—5237.5) 9、 天然石材产品放射性防护分类标准 10、 其他有关国家标准。

三、幕墙工程施工质量保证条件

1、幕墙设计必须由相应资质的设计单位承担。设计应严格执行国家相关规范。 2、幕墙工程所用材料:钢材及不锈钢、石材、粘结密封胶等均须有出厂合格证,并符合国家和行业标准。

3、加工制作所使用的材料和配件、加工质量等均应符合国家和行业标准、技术规程。

4、幕墙施工必须由相应资质的施工单位进行施工安装,安装工艺及质量应符合国家现行标准。幕墙工程的设计、材料、

JGJ133—2001、《建筑装饰装修工程质量验收规范》工程监理程序

五、幕墙材料

1. 钢材

①幕墙工程所使用的不锈钢宜采用奥氏体不锈钢材,型材材质应符合相应的现行国家标准:不锈钢棒(GB1200)、不锈钢冷轧钢板(GB3280)、不锈钢热轧钢板(GB4237)。

②普通钢筋HPB235是应用最多的钢材,使用时应对其试验报告中的化学成份, 力学性能等重点审查。

③幕墙工程中使用的钢材、五金件应有出厂合格证、试验报告,热镀锌涂层必须合格。

④钢结构幕墙高度超过40M时,钢构件宜采用高耐候结构钢,并应在其表面涂刷防腐涂料。

⑤钢构件采用冷弯薄壁型钢时,其壁厚不得小于3.5mm,强度应符合设计计算要求,表面应进行处理。 2. 石材

① 幕墙石材宜选用火成岩。

② 石材的弯曲强度不应小于8.0MPa,吸水率应小于0.8%。

③ 石材幕墙的铝合金挂件厚度不应小于4.0mm,不锈钢挂件厚度不应小于3.0mm。

④ 火烧石板与抛光石板若要求同强度时,火烧石板的厚度应比抛光石板厚3mm。

⑤ 石材的强度,弯曲强度、耐磨性、耐酸性、体积密度、吸水率等主要性能试

验应符合国家相应标准规定。 3. 建筑密封材料 ① 密封胶带

(1)密封胶条必须符合相应规范规定。玻璃幕墙采用的橡胶制品宜采用三元乙丙橡胶,氯丁橡胶。

(2)双面密封胶带的选用应根据工程所在地的风荷载、高度,幕墙面积大小来确定。当风荷载大于1.8KN/m2时玻璃幕墙宜选用中等硬度的聚胺基甲酸乙酯低发泡间隔双面胶带。当风荷载小于或等于1.8KN/m2时,宜选用聚乙烯低发泡间隔双面胶带。

(3)胶条的厚度应比结构胶厚度大1mm。 ② 耐候硅酮密封胶

(1) 耐候密封胶应具有耐水、耐溶剂、耐大气老化、低温弹性,低透气率等性能。其性能应符合标准《建筑窗用弹性密封剂》JC485之规定。 (2) 耐候硅硐密封胶必须是中性胶,禁止使用酸性胶。

(3) 耐候硅硐密封胶的使用必须在有效期内,不得使用过期的耐候胶。 (4) 耐候胶不得用结构硅酮胶代替使用。 (5) 石材用密封胶应具有耐污染性试验报告。

(6) 耐候硅酮密封胶应经检验合格后,方可使用,其性应符合下表之规定。

③结构硅酮胶

(1) 结构硅酮胶应符合国内标准《建筑用硅酮结构密封胶》GB16776。 (2) 结构硅酮胶应采用高模数中性胶,胶的性能应符合下表规定。

(3) 结构硅胶与相接触材料的相容性必须经专门性试验(进口材料均应进行

实验),且检测合格。

(4) 材料的粘接拉伸强度试验试件,应为“H”型试件。试验送 检样品,除结构硅酮胶样品外,同时还应送与之相粘接的材料(如铝合金型材,玻璃等)。其粘接破坏必须100%发生在胶体内部,即规定内聚力破坏率达100%。而不是发

生在两种材料的交界面上。

(5) 结构胶应有出厂合格证、产地证书、相容性试验、剥离粘接强度检测报告、物理耐用年限和保险年限的质量证书、使用有效期等。进口硅酮结构胶还应具有商检证。

(6) 不得使用超过有效期的结构硅酮胶。

(7) 结构硅酮密封胶宜选用耐紫外线性能强的黑色结构硅酮密封胶。 4. 其他材料

(1) 幕墙的填充材料密度应符合设计要求。

(2) 隔热保温材料(岩棉、矿棉、玻璃棉、防火板等)其难燃性、密度、强度等性能应符合国家相应标准。同时应采用铝箔或塑料薄膜包装的复合材料作为防水和防潮材料。

(3) 膨胀螺栓应有出厂合格证,进场后必须作抗拔力试验,合格后方可使用。

六、幕墙设计和施工阶段监理要点

1、幕墙设计必须由有设计资格的单位承担。

2、 监理重点为幕墙设计的安全性,防火设计、防雷设计等涉及幕墙安全的部分。 3、 幕墙主要构件必须悬挂在主体结构上,不承受主体结构的荷载,只承受其本身的荷载,按围护结构设计。

4、 所有构件和连接件应具有足够的承载力、刚度和相对于主体结构的位移能力。

5、 按相应的抗震设防能力、风荷载、温度作用进行设计。在风荷和小震 下不应破损;在设防烈度地震作用下,经修理仍能使用;在大震下骨架不应脱落。 6、 幕墙的风压变形、雨水渗漏、空气渗透、平面内变形四项性能为幕墙的基本性能,必须进行试验且合格。保温性能、隔热性能、耐撞击性能应根据工程的使用功能和业主的要求进行选择试验。

7、 防火设计必须符合防火规范要求。玻璃分隔不宜跨越两个防火区,幕墙与每层楼板、隔墙处的间隙应采用不燃烧材料填充。

8、 立面分格不宜过大,同一分格区不能上下或左右跨越两个防火单元。

9、 无窗下墙时,楼面外墙应有高度为800mm的实体部分,否则,应采取其他防火措施。

10、防火层应采取隔离措施,并应根据防火材料的耐火极限决定防火层的厚度和宽度,且应在楼板处形成防火带。

11、幕墙防火层必须采用经防腐处理且厚度小于1.5mm的钢板,不得采用铝板。 12、防火层的密封材料应采用防火密封胶。

13、防雷设计应符合《建筑物防雷设计规范》GB50057的有关规定,幕墙应形成自身的防雷体系,并应与主体结构的防雷体系可靠地连接。

七、幕墙工程的制作与安装

1. “施工组织设计”的审查要点

监理应着重审查幕墙工程“施工组织设计”中下表之内容。

2. 审查、确认进场材料

①施工单位一般应提交以下资料: • 进口材料均应提交商检报告

•产地证明、出厂合格证、性能检验报告、装船证明(进口时) • 结构胶产地证明、装船证明、有效期限证明 • 结构胶相容性试验

• 结构胶粘接力测试报告

²石材用密封胶的耐污染性试验报告 • 石材化学成份试验报告 • 石材力学性能试验报告 ²石材冻融性试验报告 • 石材胶渗油试验报告 • 钢材化学成份报告 • 钢材力学性能报告 • 膨胀螺栓出厂合格证 • 膨胀螺栓抗拔试验报告

• 耐候胶产地证明、商检证(进口时) • • ②确认进场材料

• 凡进场材料均应经几方见证取样,送有关单位进行试验合格后,方可进场使用。 • 进场材料必须与施工合同、标底、报送的技术资料、审批的施工组织设计相符合。

• 进场材料必须和送检样品相一致。

• 凡开箱材料,构件必须经几方共同验收,并留照片存档。 • 现场加工场地,堆放场地必须准备就绪。 3. 幕墙材料制作加工

⑴幕墙材料和构件加工分现场和厂内加工,监理工程师必须认真监督,这是保证幕墙质量的关键工序。厂内加工时,若监理合同有规定,应派专职人员进厂定时或不定时的进行监理。 ⑵板的制作加工

²石板连接部位应无崩坏、暗裂等缺陷;其他部位崩边不大于5mm³20mm,或缺角不大于20mm时可修补后使用,但每层修补的石板块数不应大于2%,且宜用于立面不明显部位;

²石板的长度、宽度、厚度、直角、异型角、半圆弧形状、异型材及花纹图案造型、石的外形尺寸均应符合设计要求;

²石板外表面的色泽应符合设计要求,花纹图案应按样板检查。石板四周围不得有明显的色差;

²火烧石应按样板检查火烧后的均匀程序,火烧石不得有暗 裂、崩裂情况; ²石板的编号应同设计一致,不得因加工造成混乱;

²石板应结合其组合形式,并应确定工程中使用的基本形式后进行加工; ²石板加工尺寸允许偏差应符合现行行业标准《天然花岗石建筑板材》(JC205)的有关规定中一等品要求。

钢销式安装的石板加工应符合下列规定:

²钢销的孔位应根据石板的大小而定。孔位距离边端不得小于石板厚度的3倍,也不得大于180㎜;钢销间距不宜大于600㎜;边长不大于1.0m时每边应设两个钢销,边长大于1.0m时应采用复合连接;

²石板的钢销孔深度宜为22~33㎜,孔的直径宜为7~8㎜,钢销直径宜为5~6㎜,钢销长度宜为20~30㎜。

²石板的钢销孔处不得有损坏或崩裂现象,孔径内应光滑、洁净。 通槽式安装的石板加工应符合下列规定:

²石板的通槽宽度宜为6㎜或7㎜,不锈钢支撑板厚度不宜小于3.0㎜,铝合金支撑板厚度不宜小于4.0㎜;

²石板开槽后不得有损坏或崩裂现象,槽口应打磨成45°倒角;槽内应光滑、洁净。

短槽式安装的石板加工应符合下列规定:

²每块石板上下边应各开两个短平槽,短平槽长度不应小于100㎜,在有效长度内槽深度不宜小于15㎜;开槽宽度宜为6㎜或7㎜;不锈钢支撑板厚度不宜小于3.0㎜,铝合金支撑板厚度不宜小于4.0㎜。弧形槽的有效长度不应小于80㎜。

² 两短槽边距离石板两端部的距离不应小于石板厚度的3倍且不应小于85㎜,也不应大于180㎜。

²石板开槽后不得有损坏或崩裂现象,槽口应打磨成45°倒角,槽内应光滑、

洁净。

²当石板的转角支撑采用不锈钢支撑件组装时,不锈钢支撑件的厚度不应小于3㎜;

²当石板的转角支撑采用铝合金型材专用件组装时,铝合金型材壁厚不应小于4.5㎜,连接部位的壁厚不应小于5㎜。 ⑶石材构件检验

²石材幕墙构件应按同一种类构件的5%进行抽样检查,且每种构件不得少于5件。当有一个构件抽检不符合上述规定时,应加倍抽样复验,全部合格后方可出厂。

²构件出厂时,应附有构件合格证书。

²幕墙构件若在厂内加工,且监理合同有要求时,专业监理工程师应驻厂监理或专人不定期进厂监理。

4. 幕墙工程的安装施工 ①可进行幕墙施工的先决条件: • 主体结构已达到验收规范的要求。

• 现场已清理,土建脚手架已拆除。污染幕墙施工的工序已完,若未完也已采取保护措施,达到幕墙施工要求。 • 有加工、堆放场地。

• 1∶1实际采用的幕墙样板已认可。 • 构件、材料、零附件已认可验收。

• 主体上的予埋件应在主体施工时按设计要求埋设。预埋件应牢固,位置准确,预埋件的位置误差应按设计要求进行复查。若标高偏差>10㎜,位置差>20㎜,则应采取补救措施。

·若有变更,是否已经设计院、业主、监理认可,并有相应的技术文件。 • 幕墙安装的基准线已设定,认可。

• 关键工序的技术人员及技工的岗位合格证书已具备。

②石材幕墙安装质量见下表

③监理着重检查项目

④幕墙隐蔽项目验收应包括: ²预埋件(或后置埋件)

• 幕墙构件与主体结构的连接节点安装 • 幕墙与建筑四周间隙处理 • 幕墙防火构造

• 伸缩缝、沉降缝及墙面转角处的构造节点 • 防雷装置

5. 幕墙的性能试验

• 一般幕墙面积超过10000m2均应进行物理性能试验。性能试验包括七项内容:

雨水渗漏试验(GB/T15228—94)、空气渗透试验(GB/T15226—94)、风压变形试验(GB/T15227—94)、平面内变形性能试验,这四项内容为基本实验项目,必须进行。保温性能试验(GB8484—87)、隔音性能试验(GB8485—87)、耐撞击性能试验这三项内容是在必要时或应业主要求时进行的试验。 • 试验试件由承包商制作,监理按规定监督实施。 • 性能试验应在具备资格的试验单位进行。

• 承包商在委托试验之前,应编制“试验计划”,计划中应明确规定试验内容、方法、程序、进度、合格标准等,并应得到业主、监理的认可。

• 进行试验时,三方应在场,若不能在场,试验方应保证出具具有法律效力的报告,报告必须公正、客观、真实。

• 物理性能试验报告是竣工资料的重要组成部分。

八、幕墙工程验收

幕墙工程涉及安全的项目,必须单独进行专项检查验收。 1、 现场验收

① 达到验收条件后,监理应组织设计、业主、施工等单位进行初验,列出整改清单,监督施工单位逐条消项。 ② 参与幕墙工程的竣工验收。

③ 验收应在施工完毕、脚手架拆除、剥去全部保护材料、进行清洗整体、幕墙外露后进行。

④ 幕墙的所有立面均应进行验收,可依一个大面作为基本单元进行验收。 ⑤抽查频率:每500-1000平方米为一个检验批,每个检验批每100平方米至少抽查一处,每处不少于10平方米。 石材幕墙工程验收应按如下项目进行验收: 主控项目:

(1)石材幕墙工程所用材料的品种、规格、性能和等级,应符合设计要求及国家现行产品标准和工程技术规范的规定。石材弯曲强度不应小于8.0MPa;吸水

率应小于0.8%。石材幕墙的铝合金挂件厚度不应小于4.0mm,不锈钢挂件厚度不应小于3.0mm。检查产品合格证书、性能检测报告、材料进场验收记录和复验报告。

(2)石材幕墙的造型、立面分格、颜色、光泽、花纹和图案应符合设计要求。 (3)石材孔、槽的数量、深度、位置、尺寸应符合设计要求。

(4)石材幕墙主体结构上的预埋件和后置埋件的位置、数量及后置埋件的拉拔力必须符合设计要求,检查拉拔力检测报告和隐蔽工程验收记录。

(5)石材幕墙的金属框架立柱与主体结构预埋件的连接、立柱与横梁的连接、连接件与金属框架的连接、连接件与石材面板的连接必须符合设计要求,安装必须牢固。

(6)金属框架和连接件的防腐处理应符合设计要求。

(7)石材幕墙的防雷装置必须与主体结构防雷装置可靠连接。

(8)石材幕墙的防火、保温、防潮材料的设置应符合设计要求,填充应密实、均匀、厚度一致。

(9)各种结构变形缝、墙角的连接节点应符合设计要求和技术标准的规定。 (10)石材表面和板缝的处理应符合设计要求。

(11)石材幕墙的板缝注胶应饱满、密实、连续、均匀、无气泡,板缝宽度和厚度应符合设计要求和技术标准的规定。

(12)石材幕墙应无渗漏。查验在易渗漏部位的淋水试验。 一般项目:

(1)石材幕墙表面应平整、洁净,无污染、缺损和裂痕。颜色和花纹应协调一致,无明显色差, 无明显修痕。

(2)石材幕墙的压条应平直、洁净、接口严密、安装牢固。

(3)石材接缝应横平竖直、宽窄均匀;阴阳角石板压向应正确,板边合缝应顺直;凸凹线出墙厚度应一致,上下口应平直;石材面板上洞口、槽边应套割吻合,边缘应整齐。

(4)石材幕墙的密封胶缝应横平竖直、深浅一致、宽窄均匀、光滑顺直。 (5)石材幕墙上的滴水线、流水坡向应正确、顺直。

(6)每平方米石材的表面质量和检验方法应符合下表的规定。

(7)石材幕墙安装的允许偏差和检验方法应符合下表的规定。

2、工程提交资料验收

1、项目监理处应对以下资料进行审查: ① 设计竣工图。

② 结构计算书、设计文件、设计修改、材料代用文件。 ③ 各种材料、构件出厂合格证及各种试验报告(如前述) ④ 施工自检记录。 ⑤ 隐蔽验收记录。

⑥ 各种进口材料的商检报告。

⑦ 正常情况下物理耐用年限质量保证书。

⑧ 各种施工安装质量监测文件:照片、录像带、洽商记录、 施工安装测评记录。 ⑨ 幕墙物理性能试验报告。

2、幕墙使用期间每年应进行维护清洗,5年进行全面检查一次。

3、幕墙工程竣工资料单独整理,最终并入单位工程“建筑装饰装修工程分部”之中。


相关内容

  • 石材幕墙工程
  • 目 录 1. 项目中心工程管理工作要点 ........................................................ 1 2. 二次设计与图纸审查 .......................................................... ...

  • 石材幕墙背栓连接干施工方案2016-6
  • 邮电业务楼幕墙工程施工方案 北京建黎铝门窗幕墙有限公司 2016年6月 邮电业务楼幕墙工程施工方案 一.施工流程 测量放线→埋件安装→连接件安装→钢立柱安装→封修板安装→层间防火保温棉安装→横梁安装→挂件安装(背栓)→石材安装→打胶→清洁.验收. 详细工艺流程及操作要点 二.施工部署与方法 1.施工 ...

  • 石材玻璃幕墙设计
  • 第一章编制说明 一.编制原则 1.本工程组织设计编制的目的是从施工全过程出发,在保证施工质量和施工工期的前提下,根据各种具体的施工条件,为临平远东宾馆外墙工程施工阶段提供较为完整的纲领性技术文件.在施工中,我们将在此基础上进行强化.细化与适当调整施工方案和施工计划,使之更好.更全面地指导施工. 2. ...

  • 石材.金属材料的幕墙:优缺点对比
  • 石材.玻璃.金属材料的幕墙:优缺点对比 一.石材幕墙的优缺点 优点: 1.天然材质.光亮晶莹.坚硬永久.高贵典雅. 2.耐冻性:石材在潮湿状态下,能抵抗冻融而不发生显著之破坏者,此性能称为耐冻性.岩石孔隙内的水份在温度低到摄氏零下 20时,发生冻结,孔隙内水份膨胀比原有体积大1/10,岩石若不能抵抗 ...

  • 石材幕墙施工组织方案
  • 工程名称 编制单位:编制日期:离石区贵都大楼 外装饰装修工程施工 施 工 组 织 方 案 贵都大楼外装修工程 2011年06月04日 录 一. 编制依据„„„„„„„„„„„„„„„„„(3) 1. 施工合同„„„„„„„„„„„„„„„„„(3) 2. 施工图„„„„„„„„„„„„„„„„„„( ...

  • 幕墙工程施工方案
  • 大丰•壹方城幕墙工程 施 工 方 案 江苏建设控股集团有限公司 2016年6月6日 目 录 1.总则„„„„„„„„„„„„„„„„„„„„„„.1 2.施工准备„„„„„„„„„„„„„„„„„„„„.2 3.施工部署„„„„„„„„„„„„„„„„„„„„.8 4.工艺流程„„„„„„„„„„„ ...

  • 石材幕墙设计说明
  • 设 计 总 说 明 (一)工程概况 1.建筑概况 (1): 工程名称: (2): 建筑设计单位: (3): 结构形式: (4): 建筑层数: (5): 建筑高度: (6): 建筑类别: 二类 (7): 地面粗糙度类型: B类 (8): 建筑抗震设防烈度: 7度 (9): 基本风压: 0.50KN/㎡ ...

  • 石材幕墙施工合同
  • 施 工 合 同 协 议 书 (石材干挂工程) 发包人(全称): (以下简称甲方) 承包人(全称): (以下简称乙方) 按照<中华人民共和国合同法>和<中华人民共和国建筑法>及相关法律.行政法规,为明确各方技术经济责任,保证工程正常进行,双方遵循平等.自愿.公平和诚实信用的原则 ...

  • 石材幕墙专项施工方案-副本
  • 原和睦南区A-27拆迁安置房一期 建筑外墙石材干挂 专项施工方案 编制: 审核: 审批: 浙江摩天幕墙有限公司 二0一二年 八 月 第一章 编制依据 1.由杭州装潢工程有限公司提供的幕墙设计图纸:由汉嘉设计集团有限公司提供的和睦南区A-27拆迁安置房一期标段建筑.结构设计图纸 2.<建筑装饰工 ...