图纸注解翻译

图纸标注译文(顺序为从左至右)

预制厂位置及平面布置图注解

预制厂位置及平面布置详见下图:

The location and layout of prefabrication plants is shown below: 205 国道:No. 205 highway

长芦公路:Changlu road

四建扬子项目经理部:TFCC Yangtze project management department 聚酯厂:Polyester Plant

新大化工厂:Xingda Chemical Plant

新建长芦预制厂:the newly-built Changlu Prefabrication Plant 乙烯路:Ethylene Road

长芦预制厂平面布置图注解

图例:Legend

原有道路:existing road

电线杆(原有):wire pole

新建临时道路:newly-built temporary road

电缆及配电箱:cable and distribution box

供水线及水阀:water supplying pipe and valve

轨道:rail

排水沟:drainage ditch

照明灯:lighting lamps

厕所:W.C.

灯塔:lighthouse

厂外路:Changwai Road

阀门试压站:valve pressure testing station

阀门存放区:valve stock area

材料摆放区:material laydown

配件库:fitting storehouse

供应办公室:supply office

材料摆放区:material laydown

抛丸机:shot-blasting machine

钢材抛丸区:steel shot-blasting processing area

塔吊:tower crane

变压器:transformer

防腐厂房:anti-corrosion workshop

防腐设备:anti-corrosion equipment

下料组对区:material cutting and assembly area

隔离栏:fence

组对焊接区:assembly and welding area

C 型吊:C-type gantry crane

滚板:plate rolling machine

钻床:driller

刨床:planing machine

剪板:cutting machine

机械加工区:mechanical processing area

露天预制区:outdoor prefabrication area

成品摆放区:finished products laydown

办公室:office

建北:construction north

说明:notes:

1.预制厂为梯形,总面积约40000平方米,位于长芦公司路北侧,西临聚酯厂。

1. The contour of the prefabrication is trapezoid, with total area 40,000 m2, located in north of Changlu Road, near Polyester Plant in the west.

2.预制厂内建预制厂房12米X120米彩板结构一座,双层轻型结构办公室两座,宽4.8米、长24米、高5.5米。

2. In the prefabrication plant, there established one prefabrication shop, 12m by 120m, in color board structure; two two-storey offices, 4.8m by 24m by

5.5m, in light material structure.

3.厂内从高压线引入电源,并安装两台800KVA 变压器,埋设低压电缆至各个配电箱。

The Plant get power from outside high-voltage electric source, equipped with two 800KVA transformers, the low-voltage cables is embedded and connected with distribution boxes.

4.供应库区建6座轻型结构库房,规格8米X20米,阀门试压站1座6米X30米轻型结构。

In the supply area, there are 6 warehouse (8m x 20m), 1 valve pressure testing station(6m x 30m), both in light material structure.

5.预制厂四周建围墙封闭,沿公路侧为钢围栏。围墙四周修建排水沟,厂内建2座水冲厕所。

The prefabrication plant is enclosed with wall, using steel grate in the part facing road. Outside of enclosure is drainage ditch. There are 2 W.C. in the plant.

中国石化集团第四建设公司:

The Fourth Construction Company of SINOPEC

工程名称:Project Name

扬子石化有限责任公司65万吨/年乙烯改造工程:

650,000 t/y ethylene renovation project of Yangtze Petrochemical Corporation.

设计:designed by:

制图:draught by:

审核:approved by:

长芦预制厂平面布置图:Layout of Changlu Prefabrication Plant 档案号:file no.

比例:scale

日期:date

现场预制厂平面布置图

装置北:construction north

钢板:steel plate

钢管:steel pipe

共做6组:6 sets in total

图例:legend

办公室:office

电焊机棚:welding machine shelter

施工临时供水线及水阀:temporary water supply piping and valve for construction.

施工临时电缆及配电箱:temporary cable and distribution box for construction

主配电箱:main distribution box

变压器:transformer

灭火器:fire extinguisher

沉淀池(1.5m X 1.5m X 1.5m):precipitation basin

说明:notes

1.水冲式厕所布置于装置东侧管廊下,利用原有污水管道排污。

1. W.C. is under eastern piping rack of the unit, using the existing drainage pipe to dispose sewage.

2.整个现场四周用彩板围护。

The whole field is enclosed with color sheet.

3.临时电缆穿越道路时加钢套管埋地敷设。

The temporary cable is embedded with protection by steel sleeve, when crossing road.

4.临时供水线埋地敷设。

4.The temporary water supply piping is embedded.

5.灭火器为5kgABC 型手提式干粉式灭火器,每具5个,并配置相应的砂土、消防锹、消防桶。

The fire extinguisher is portable CO2 extinguisher (type: 5kg ABC), 5 pieces a group, matched with sand, spade and barrel.

排水沟:drainage ditch

仓库:warehouse

供应区:material supply area

项目办公室:project office

混凝土地面:concrete floor

技术部资料室:technical department document room

技术部办公室:technical department office

一层:1 st floor

二层:2 st floor

作业单位办公室:Job team office

混凝土地面:concrete floor

临时道路:temporary road

管式平台:Tube platform

吊车行走路线:route for crane

防腐生产线:anti-corrosion production line

喷砂机空压机防雨棚具体位置:location for water proof shelter of blasting machine and air compressor.

三气棚:three-gas shelter

排水沟:drainage ditch

吊车行走路线:route for crane

原有排水沟:existing drainage ditch

构件堆放场:structural parts stock yard

混凝土地面:concrete floor

临时道路:temporary road

排水沟:drainage ditch

现场预制厂平面布置图:Layout of Field Prefabrication Plant

中国石化集团第四建设公司:

The Fourth Construction Company of SINOPEC

工程名称:project name

扬子乙烯65万吨/年改造工程:Yangtze Ethylene 650,000 t/y Renovation Project

设计:design

制图:draught

审核:approval

现场预制厂平面布置图:Layout of Field Prefabrication Plant

档案号:file no.

比例:scale

日期:date

现场预制厂布置图

成品堆放区:

Finished products stock area.

工业炉辐射炉管组焊区板式平台:

Plate-type platform for assembling welding of radiation tube of industrial furnace.

地管成品存放区:Finished underground pipe stock area.

板式平台附塔管线支吊架预制区:

Tube platform for prefabrication of hangers for tower piping prefabriecation area.

电仪预制区:Electrical/instrument prefabrication area

原材料及喷砂刷油材料摆放区:Stock area for raw material,

blasting/painting material.

40吨履带吊行走:Operating area for 40t crawler crane

刷油区:Painting area

喷砂区:Blasting area

40吨履带吊行走:Routing for 40t caterpillar crane

钢结构预制区:Structural steel prefabrication area

地管预制区:Underground pipe prefabrication area

南:South

现场预制厂布置图:Layout of Field Prefabrication Plant

注:Note

其中一公司预制区于8月底全部作为六公司预制区,三公司钢结构预制区到8月底交给七公司预制附塔管线。

Including: The TFCC’s prefabrication area will be totally delivered to No. 6 Engineering Co. by the end of August, The steel structure prefabrication area of No.3 Engineering Co. will be delivered to No.7 Engineering Co. for the prefabrication of tower piping.

图纸标注译文(顺序为从左至右)

预制厂位置及平面布置图注解

预制厂位置及平面布置详见下图:

The location and layout of prefabrication plants is shown below: 205 国道:No. 205 highway

长芦公路:Changlu road

四建扬子项目经理部:TFCC Yangtze project management department 聚酯厂:Polyester Plant

新大化工厂:Xingda Chemical Plant

新建长芦预制厂:the newly-built Changlu Prefabrication Plant 乙烯路:Ethylene Road

长芦预制厂平面布置图注解

图例:Legend

原有道路:existing road

电线杆(原有):wire pole

新建临时道路:newly-built temporary road

电缆及配电箱:cable and distribution box

供水线及水阀:water supplying pipe and valve

轨道:rail

排水沟:drainage ditch

照明灯:lighting lamps

厕所:W.C.

灯塔:lighthouse

厂外路:Changwai Road

阀门试压站:valve pressure testing station

阀门存放区:valve stock area

材料摆放区:material laydown

配件库:fitting storehouse

供应办公室:supply office

材料摆放区:material laydown

抛丸机:shot-blasting machine

钢材抛丸区:steel shot-blasting processing area

塔吊:tower crane

变压器:transformer

防腐厂房:anti-corrosion workshop

防腐设备:anti-corrosion equipment

下料组对区:material cutting and assembly area

隔离栏:fence

组对焊接区:assembly and welding area

C 型吊:C-type gantry crane

滚板:plate rolling machine

钻床:driller

刨床:planing machine

剪板:cutting machine

机械加工区:mechanical processing area

露天预制区:outdoor prefabrication area

成品摆放区:finished products laydown

办公室:office

建北:construction north

说明:notes:

1.预制厂为梯形,总面积约40000平方米,位于长芦公司路北侧,西临聚酯厂。

1. The contour of the prefabrication is trapezoid, with total area 40,000 m2, located in north of Changlu Road, near Polyester Plant in the west.

2.预制厂内建预制厂房12米X120米彩板结构一座,双层轻型结构办公室两座,宽4.8米、长24米、高5.5米。

2. In the prefabrication plant, there established one prefabrication shop, 12m by 120m, in color board structure; two two-storey offices, 4.8m by 24m by

5.5m, in light material structure.

3.厂内从高压线引入电源,并安装两台800KVA 变压器,埋设低压电缆至各个配电箱。

The Plant get power from outside high-voltage electric source, equipped with two 800KVA transformers, the low-voltage cables is embedded and connected with distribution boxes.

4.供应库区建6座轻型结构库房,规格8米X20米,阀门试压站1座6米X30米轻型结构。

In the supply area, there are 6 warehouse (8m x 20m), 1 valve pressure testing station(6m x 30m), both in light material structure.

5.预制厂四周建围墙封闭,沿公路侧为钢围栏。围墙四周修建排水沟,厂内建2座水冲厕所。

The prefabrication plant is enclosed with wall, using steel grate in the part facing road. Outside of enclosure is drainage ditch. There are 2 W.C. in the plant.

中国石化集团第四建设公司:

The Fourth Construction Company of SINOPEC

工程名称:Project Name

扬子石化有限责任公司65万吨/年乙烯改造工程:

650,000 t/y ethylene renovation project of Yangtze Petrochemical Corporation.

设计:designed by:

制图:draught by:

审核:approved by:

长芦预制厂平面布置图:Layout of Changlu Prefabrication Plant 档案号:file no.

比例:scale

日期:date

现场预制厂平面布置图

装置北:construction north

钢板:steel plate

钢管:steel pipe

共做6组:6 sets in total

图例:legend

办公室:office

电焊机棚:welding machine shelter

施工临时供水线及水阀:temporary water supply piping and valve for construction.

施工临时电缆及配电箱:temporary cable and distribution box for construction

主配电箱:main distribution box

变压器:transformer

灭火器:fire extinguisher

沉淀池(1.5m X 1.5m X 1.5m):precipitation basin

说明:notes

1.水冲式厕所布置于装置东侧管廊下,利用原有污水管道排污。

1. W.C. is under eastern piping rack of the unit, using the existing drainage pipe to dispose sewage.

2.整个现场四周用彩板围护。

The whole field is enclosed with color sheet.

3.临时电缆穿越道路时加钢套管埋地敷设。

The temporary cable is embedded with protection by steel sleeve, when crossing road.

4.临时供水线埋地敷设。

4.The temporary water supply piping is embedded.

5.灭火器为5kgABC 型手提式干粉式灭火器,每具5个,并配置相应的砂土、消防锹、消防桶。

The fire extinguisher is portable CO2 extinguisher (type: 5kg ABC), 5 pieces a group, matched with sand, spade and barrel.

排水沟:drainage ditch

仓库:warehouse

供应区:material supply area

项目办公室:project office

混凝土地面:concrete floor

技术部资料室:technical department document room

技术部办公室:technical department office

一层:1 st floor

二层:2 st floor

作业单位办公室:Job team office

混凝土地面:concrete floor

临时道路:temporary road

管式平台:Tube platform

吊车行走路线:route for crane

防腐生产线:anti-corrosion production line

喷砂机空压机防雨棚具体位置:location for water proof shelter of blasting machine and air compressor.

三气棚:three-gas shelter

排水沟:drainage ditch

吊车行走路线:route for crane

原有排水沟:existing drainage ditch

构件堆放场:structural parts stock yard

混凝土地面:concrete floor

临时道路:temporary road

排水沟:drainage ditch

现场预制厂平面布置图:Layout of Field Prefabrication Plant

中国石化集团第四建设公司:

The Fourth Construction Company of SINOPEC

工程名称:project name

扬子乙烯65万吨/年改造工程:Yangtze Ethylene 650,000 t/y Renovation Project

设计:design

制图:draught

审核:approval

现场预制厂平面布置图:Layout of Field Prefabrication Plant

档案号:file no.

比例:scale

日期:date

现场预制厂布置图

成品堆放区:

Finished products stock area.

工业炉辐射炉管组焊区板式平台:

Plate-type platform for assembling welding of radiation tube of industrial furnace.

地管成品存放区:Finished underground pipe stock area.

板式平台附塔管线支吊架预制区:

Tube platform for prefabrication of hangers for tower piping prefabriecation area.

电仪预制区:Electrical/instrument prefabrication area

原材料及喷砂刷油材料摆放区:Stock area for raw material,

blasting/painting material.

40吨履带吊行走:Operating area for 40t crawler crane

刷油区:Painting area

喷砂区:Blasting area

40吨履带吊行走:Routing for 40t caterpillar crane

钢结构预制区:Structural steel prefabrication area

地管预制区:Underground pipe prefabrication area

南:South

现场预制厂布置图:Layout of Field Prefabrication Plant

注:Note

其中一公司预制区于8月底全部作为六公司预制区,三公司钢结构预制区到8月底交给七公司预制附塔管线。

Including: The TFCC’s prefabrication area will be totally delivered to No. 6 Engineering Co. by the end of August, The steel structure prefabrication area of No.3 Engineering Co. will be delivered to No.7 Engineering Co. for the prefabrication of tower piping.


相关内容

  • S版六年级第十课两小儿辩日原文与注解
  • 10.两小儿辩日 节选自<列子. 汤问> 孔子东游,见两小儿辩斗,问其故. 翻译:孔子向东方游学,途中见到两个小孩在争辩,就问他们在争辩的原因. 一儿曰:"我以日始出时去人近,而日中时远也." 翻译:一个小孩说:"我认为太阳刚升起的时候距离人近,而到正午的时 ...

  • 曹刿论战重点书下注解,翻译句子
  • <曹刿论战>解词及课文翻译 一.书下注解. 1<曹刿论战>选自________________.<左传>相传是_____(年代)时___国史官______所写. 2肉食者:________________________. 3间:___________. 4鄙:_ ...

  • 初一上册古诗词.文言文原文+注解+翻译
  • 七年级上册古诗词.文言文 1.<世说新语>两则 <咏雪> 谢太傅寒雪日内集,与儿女讲论文义.俄而雪骤,公欣然曰: "白雪纷纷何所似?"兄子胡儿曰:"撒盐空中差可拟."兄女曰:"未 若柳絮因风起."公大笑乐.即公大兄无 ...

  • 这些中国特色词汇怎么翻译才能达意呢?
  • ?<政府工作报告>双语材料一向是汉译英学习的基本功,其中有大量的中文四.六句和加有引号的专有名词术语,我们以2014年<政府工作报告>为例,看一下这些官方表述的英文处理有何规律,能否从中学会举一反三,触类旁通. 1.原文: 生态文明建设关系人民生活,关乎民族未来.雾霾天气范围 ...

  • 李凭箜篌引带详细翻译注解
  • <李凭箜篌引>(作品出处是<全唐诗>,年代中唐,体裁为七言古诗,作者是"诗鬼"-李贺) 吴丝蜀桐1张2高秋3,空山凝云颓不流4. 在深秋的夜晚,弹奏起吴丝蜀桐制成精美的箜篌.听到美妙的乐声,天空的白云凝聚起来不再飘游. [1.吴丝蜀桐:吴地之丝,蜀地之桐. ...

  • 工程图图纸格式及模板设置
  • 第六章 工程图 6.1 工程图概述 零件和装配体的设计完成后,需要将其信息在工程图中表达出来,这样才能向工程技术人员传递具体的几何形状和尺寸信息,最终指导工人进行零件的加工和装配. 工程图与生成工程图的相应零件.装配体模型是互相链接的文件,对其中任何一个文件进行更改都会导致其它文件的相应更新. So ...

  • [虽有嘉肴]导学案
  • <虽有嘉肴>导学案 学习目标: 1. 背诵课文,积累相关文学常识和重要的文言词语. 2. 借助工具书.课下注解疏通文意,理解文中所蕴含的道理. 3. 联系实际,用正确的学习方法指导自己的学习. 学习重点难点: 背诵课文,积累重要的文言词语,理解文中所蕴含的道理. 学习方法: 朗读法.&q ...

  • 捕蛇者说教案2
  • 19.捕蛇者说 教学目标 (一)知识与能力 1.了解柳宗元的文学常识及"说"的体裁特点 2.掌握文中的重点实词,能借助工具书疏通文意 3.理解对比.衬托手法的运用及其作用: (二)过程与方法 1.通过朗诵文章能了解文章大意 2.在了解文章内容的前提下,理解作者表达的思想感情 3. ...

  • [劝学]教学实录
  • <劝学>教学实录 <劝学>,是高一新生在高中接触的第一篇文言文,如何让他们一下子对文言文产生兴趣?如何提高他们的文言文阅读能力?这是两个很重要的问题,必须在学习文言文的过程中给予突破. 附:学文言文之前,已经用了一节课的时间讲了一些语法知识,以帮助解读文言文. [教学实录] ...