ONTARIO PROVINCIAL STANDARD

SPECIFICATION

METRIC OPSS 304

NOVEMBER 2006

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT

TABLE OF CONTENTS

304.01 SCOPE

304.02 REFERENCES

304.03 DEFINITIONS

304.04 SUBMISSION AND DESIGN REQUIREMENTS - Not Used

304.05 MATERIALS

304.06 EQUIPMENT

304.07 CONSTRUCTION

304.08 QUALITY ASSURANCE - Not Used

304.09 MEASUREMENT FOR PAYMENT

304.10 BASIS OF PAYMENT

APPENDICES

304-A Commentary

304.01 SCOPE

This specification covers the requirements for surface preparation, application of bituminous binder, and application of aggregate for single and double surface treatment.

304.01.01 Significance and Use of Appendices

Appendices are not a mandatory part of the specification unless invoked by the Owner.

Appendix 304-A is a commentary appendix to provide designers with information on the use of the specification in a Contract.

304.02 REFERENCES

This specification refers to the following standards, specifications, or publications:

Ontario Provincial Standard Specifications, Material

OPSS 1006 Aggregates - Surface Treatment OPSS 1103 Emulsified Asphalt

Ministry of Transportation Publications

Ontario Traffic Manual (OTM): Book 7 - Temporary Conditions

304.03 DEFINITIONS

For the purpose of this specification, the following definitions apply:

Appurtenances mean maintenance hole, catch basin, valve chamber, and water valve covers and similar Utility access covers located within the paved portion on the roadway.

Binder means an emulsified asphalt with or without polymer modification used to bind aggregates.

Double Lap means the coverage produced from the application of binder where the binder from each spray bar nozzle overlaps the binder application from the adjacent nozzle by one half.

Double Surface Treatment means two successive single surface treatments.

End Nozzle means a spray bar nozzle which delivers binder to the inside half of a standard spray pattern.

Lot means the quantity of work completed with a tanker truck shipment of binder.

Single Surface Treatment means a single application of bituminous binder followed by a single application of Class 1, Class 2, Class 3, Class 4, Class 5, or Class 6 aggregate.

Triple Lap means the coverage produced from the application of binder where the binder from each spray bar nozzle overlaps the binder application from the adjacent nozzle by two thirds.

304.05 MATERIALS

304.05.01 Binders

Binders shall be according to OPSS 1103.

304.05.02 Aggregates

Aggregates shall be according to OPSS 1006 and as specified in the Contract Documents.

304.06 EQUIPMENT

304.06.01 Pressure Distributor

The pressure distributor shall be designed and manufactured to spray binder on the road surface. The pressure distributor shall be capable of applying binder at the specified rates and in a continuous and uniform manner both longitudinally and transversely for a full lane width.

304.06.02 Mechanical Aggregate Spreader

The mechanical aggregate spreader shall be designed and manufactured to be self-propelled and capable of continuously and uniformly distributing aggregate at the specified application rate.

304.06.03 Rotary Power Brooms

Brooms shall be capable of cleaning gravel, sand, dirt, and other debris from the roadway surface.

304.06.04 Rollers

304.06.04.01 General

Rollers shall be ballasted according to the manufacturer's recommendations.

304.06.04.02 Steel Drum Rollers

Steel drum rollers shall be single drum vibratory rollers according to Table 1 and shall be operated in the static mode, if the drum is not rubber coated. Drive wheels shall not mark the aggregate.

304.06.04.03 Pneumatic-Tired Rollers

Pneumatic-tired rollers shall be self-propelled and be according to Table 2. The wheels shall be mounted with smooth tread rubber tires. Tire inflation pressure shall be a minimum of 350 kPa when the tires are cold. All tires shall have equal pressure. Each roller shall be equipped with a suitable tire pressure gauge for checking tire inflation pressure.

304.06.05 Pilot Vehicle

The pilot vehicle shall be equipped according to the requirements of the OTM, Book 7.

304.07 CONSTRUCTION

304.07.01 Operational Constraints

Surface treating operations shall not be carried out when the ambient temperature at the work location is less than 10 °C or where climatic or site conditions preclude the curing of the binder.

The application of binder and aggregate shall terminate one hour before sunset.

Surface treatment shall not be carried out prior to May 15th south of a line through Pembroke, Magnetawan, and Pointe au Baril Station or prior to June 1st north of the line.

Surface treatment shall not be carried out after September 1st except with the approval of the Contract Administrator. Surface treatment may be extended to September 30th provided a high float emulsion is used.

304.07.02 Sampling

304.07.02.01 Binder

The Contractor shall provide binder field samples for testing purposes as specified in the Contract Documents.

The work shall include sampling, labelling, packaging, and delivery of samples to the laboratory designated in the Contract Documents within 5 Business Days.

Each binder sample shall consist of a minimum size of two full 4-litre samples of material. The sample containers for emulsified asphalt binder samples shall be new triple tight cans. Sample containers shall be supplied by the Contractor.

304.07.02.02 Aggregates

The Contractor shall provide aggregate samples for testing purposes as specified in the Contract Documents.

304.07.03 Determination of Binder and Aggregate Application Rates

The application rate for the binder and the aggregate shall be as specified in the Contract Documents.

The Contractor shall demonstrate to the Contract Administrator satisfactory compliance to the specified application rates of binder and aggregate. At the Contract Administrator's option, this compliance may include a minimum 300 m one lane width trial section to ensure that the binder and aggregate are applied at the specified rate.

304.07.03.01 Acceptance of Binder Application Rate

The binder application rate is acceptable when the rate of application is within a tolerance of ± 5% of the specified rate.

304.07.03.02 Acceptance of Aggregate Application Rate

The aggregate application rate is acceptable when the rate of aggregate application is within a tolerance of ± 10% of the specified rate.

304.07.04 Surface Preparation

Existing bituminous surfaces shall be clean and free of all debris and standing water before application of binder.

Where a binder is to be applied on a granular surface, the surface shall be free of standing water and shall be prepared by dampening, fine grading, and compacting immediately prior to the application of the binder. The surface shall be finish rolled to ensure a compacted smooth and float free surface.

304.07.05 Binder Application Temperatures

Binder application temperatures shall be according to OPSS 1103.

304.07.06 Application of Binder

After the surface has been prepared, the binder shall be uniformly sprayed on the road surface at the specified application rate. When binder is to be applied to two adjacent lanes, the application of binder on the initial pass shall be done without the use of an end nozzle. When binder is applied to the adjacent lane, the nozzle positioned closest to the first application of binder shall be an end nozzle.

The spray bar height shall be adjusted to ensure that there is triple lap of the binder application. At the written request of the Contractor, the Contract Administrator may allow the use of a double lap application.

Longitudinal joints shall be constructed to ensure full coverage on the centreline.

The application of binder shall terminate at the same station for both lanes at the end of each day.

All roadway appurtenances within the area to be surfaced shall be properly covered and protected immediately prior to single and double surface treatment.

304.07.07 Application of Aggregate

Aggregate shall be uniformly applied at the rate specified. The distance between the pressure distributor and the spreader shall not be more than 30 m.

If excess aggregate is present when constructing a double surface treatment, the excess shall be removed prior to the second application of binder.

304.07.08 Rolling

Immediately after spreading, the aggregate shall be rolled with a minimum of two pneumatic-tired rollers. The entire treated area shall receive two passes from each pneumatic-tired roller.

When the surface treatment is placed on a prepared granular grade, one pneumatic-tired roller shall be replaced by a steel drum roller. The entire treated area shall receive two passes from the pneumatic-tired roller and one pass from the steel drum roller.

Rollers shall be operated at such a speed as to prevent aggregate pick-up, but in no case shall the speed of rollers exceed 10 km/h.

All rolling shall be completed within 300 m of the aggregate spreader. When the combination of rollers is not sufficient to maintain the completed rate of progress, additional rollers shall be used.

304.07.09 Traffic Convoy

When specified in the Contract Documents, the Contractor shall convoy traffic according to the OTM, Book 7.

The pilot vehicle shall guide one-way traffic through or around construction. The maximum speed of the convoy shall be 30 km/h. Convoying shall be maintained until such time as the surface treatment is able to carry traffic without damage.

304.07.10 Protection of the Work

The Contractor shall repair damaged areas until such time as the work has been accepted by the Contract Administrator.

Signs indicating fresh surface treatment, or similar wording, shall be erected at the project limits and any intersections throughout the project immediately after placement of surface treatment and shall remain in place for a minimum of 72 hours.

304.07.11 Management of Excess Material

Management of excess material shall be as specified in the Contract Documents.

304.09 MEASUREMENT FOR PAYMENT

304.09.01 Actual Measurement

304.09.01.01 Binder

Binder shall be measured for payment by mass in kilograms according to the requirements of the Contract Documents.

304.09.01.02 Class 1, 2, 3, 4, 5 or 6 Aggregate

304.09.01.02.01 By Mass

Aggregate applied to the road shall be measured in tonnes according to the requirements of the Contract Documents.

304.09.01.02.02 By Volume

Measurement shall be by volume in cubic metres, loose, by predetermined truck capacities. The predetermined capacity of each truck shall be that computed from its box dimensions.

Loading of each truck shall be kept to not less than the predetermined capacity. The Contractor shall not be required to load trucks in excess of this capacity to allow for bulking, and no deduction shall be made for any settlement of the load during transportation, provided that such settlement is not caused by spillage or leakage.

Each truck shall be uniquely and readily identifiable.

304.09.01.03 Traffic Convoy

The measurement for traffic convoy shall be in hours based on the number of hours that the pilot vehicle is convoying traffic.

304.10 BASIS OF PAYMENT

304.10.01 Binder "type " - Item

Class 1 Aggregate - Item Class 2 Aggregate - Item Class 3 Aggregate - Item Class 4 Aggregate - Item Class 5 Aggregate - Item Class 6 Aggregate - Item Traffic Convoy - Item

Payment at the contract price for the above tender items shall be full compensation for all labour, Equipment, and Material to do the work.

Damaged areas requiring repair prior to the acceptance of the work shall be repaired by the Contractor at no extra cost to the Owner.

TABLE 1

Requirements for Steel Drum Rollers

Minimum Drum Diameter mm

Minimum Drum

Width mm

Minimum Static Mass per mm of Drum Width

kg

TABLE 2

Requirements for Pneumatic-Tired Rollers

Roller Class

Minimum Mass

t

Minimum Mass per Tire

kg

Appendix 304-A, Commentary for OPSS 304, November 2006

Note: This appendix does not form part of the standard specification. It is intended to provide

information to the designer on the use of this specification in a contract.

Designer Action/Considerations

The designer should specify the following in the Contract Documents:

- Class of Aggregate required. (304.05.02.01)

- Frequency and type of QA testing required. (304.07.02)

- Location of laboratory for delivery of samples. (304.07.02.01) - Application rate for the binder and aggregate. (304.07.03) - Traffic convoy requirements. (304.07.09)

The following applications are available depending on traffic volumes, status of road, and type of road surface:

- Single surface treatment is typically applied to either a primed road, a roadway with a previously applied surface treatment, or a paved road.

- Double surface treatment is typically applied to either a granular base or a primed road.

For design estimating purposes, the following application rates may be used:

Treatment Prime Single Surface Treatment

Aggregate Type Class 4

Class 1

Class 2 (Notes 2, 6) Class 4 (Note 3) Class 5 Class 6 Class 2, Note 6

Class 3 & 1

Class 3 & 4

Class 3 & 5

Class 2 & 6

Primer

CRS-2 or RS-2 HF-150S

CRS-2,HF-150S CRS-2 or RS-2

HFMS-2(ON) or HFMS-2P(ON) HF-150S (Note 4) HF-150S (Note 5)

CRS-2,RS-2 (Note 4) CRS-2,RS-2 (Note 5)

CRS-2,RS-2 (Note 4) CRS-2,RS-2 (Note 6)

CRS-2,RS-2 (Note 4) CRS-2,RS-2 (Note 5)

HFMS-2P(ON) (Note 4) HFMS-2P(ON) (Note 5)

Primer or Binder (Note 1) Grade

Range

2

kg/m1.90+/- 1.65-1.90 1.35-1.55 1.20-1.40 1.15-1.45 1.50-1.80 1.60-1.80 1.45-1.65

1.60-2.10 1.40-2.10

1.60-1.75 1.05-1.20

1.80-2.00 1.30-1.50

1.60-1.80 1.50-1.70

Typical

2

kg/m1.9 1.8 1.45 1.3 1.3 1.7 1.65 1.5 1.9 1.8 1.65 1.1 1.90 1.35 1.65 1.60

Aggregate

Typical

22

kg/mkg/m4 1

2 4 5 6 2 2 3 1 3 4 3 5 2 6

10-12 14-17 16.5-19 8-11 11-13 16-20 16-18 16.5-19

15-18 12-15 15-18 6.5-8 15-17 11-13.5

13.5-18 15-19

12 16 19 11 13 17 18 19 17 14 17 8 17 13 16 16

Double Surface Treatment

Notes:

1. Decrease binder rates towards the lower limit of the range when there is heavy commercial traffic.

2. Class 2 surface treatment may cause dust problems in urban areas.

3. Do not apply to flushed surface treatments, flushed pavements or where low friction values are a concern.

4. Initial application.

5. Second application.

6. The use of Granular A aggregate in a Single or Double Surface Treatment is not recommended.

Appendix 304-A

If a granular grade is planned to be open to traffic for a considerable length of time prior to the surface treatment operation, the designer should consider including an item for surface restoration according to OPSS 301, Restoring Unpaved Roadway Surfaces.

The designer should ensure that the Ontario Provincial Standards General Conditions of Contract and the 100 Series General Specifications are included in the Contract Documents.

Related Ontario Provincial Standard Drawings

None.

ONTARIO PROVINCIAL STANDARD

SPECIFICATION

METRIC OPSS 304

NOVEMBER 2006

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT

TABLE OF CONTENTS

304.01 SCOPE

304.02 REFERENCES

304.03 DEFINITIONS

304.04 SUBMISSION AND DESIGN REQUIREMENTS - Not Used

304.05 MATERIALS

304.06 EQUIPMENT

304.07 CONSTRUCTION

304.08 QUALITY ASSURANCE - Not Used

304.09 MEASUREMENT FOR PAYMENT

304.10 BASIS OF PAYMENT

APPENDICES

304-A Commentary

304.01 SCOPE

This specification covers the requirements for surface preparation, application of bituminous binder, and application of aggregate for single and double surface treatment.

304.01.01 Significance and Use of Appendices

Appendices are not a mandatory part of the specification unless invoked by the Owner.

Appendix 304-A is a commentary appendix to provide designers with information on the use of the specification in a Contract.

304.02 REFERENCES

This specification refers to the following standards, specifications, or publications:

Ontario Provincial Standard Specifications, Material

OPSS 1006 Aggregates - Surface Treatment OPSS 1103 Emulsified Asphalt

Ministry of Transportation Publications

Ontario Traffic Manual (OTM): Book 7 - Temporary Conditions

304.03 DEFINITIONS

For the purpose of this specification, the following definitions apply:

Appurtenances mean maintenance hole, catch basin, valve chamber, and water valve covers and similar Utility access covers located within the paved portion on the roadway.

Binder means an emulsified asphalt with or without polymer modification used to bind aggregates.

Double Lap means the coverage produced from the application of binder where the binder from each spray bar nozzle overlaps the binder application from the adjacent nozzle by one half.

Double Surface Treatment means two successive single surface treatments.

End Nozzle means a spray bar nozzle which delivers binder to the inside half of a standard spray pattern.

Lot means the quantity of work completed with a tanker truck shipment of binder.

Single Surface Treatment means a single application of bituminous binder followed by a single application of Class 1, Class 2, Class 3, Class 4, Class 5, or Class 6 aggregate.

Triple Lap means the coverage produced from the application of binder where the binder from each spray bar nozzle overlaps the binder application from the adjacent nozzle by two thirds.

304.05 MATERIALS

304.05.01 Binders

Binders shall be according to OPSS 1103.

304.05.02 Aggregates

Aggregates shall be according to OPSS 1006 and as specified in the Contract Documents.

304.06 EQUIPMENT

304.06.01 Pressure Distributor

The pressure distributor shall be designed and manufactured to spray binder on the road surface. The pressure distributor shall be capable of applying binder at the specified rates and in a continuous and uniform manner both longitudinally and transversely for a full lane width.

304.06.02 Mechanical Aggregate Spreader

The mechanical aggregate spreader shall be designed and manufactured to be self-propelled and capable of continuously and uniformly distributing aggregate at the specified application rate.

304.06.03 Rotary Power Brooms

Brooms shall be capable of cleaning gravel, sand, dirt, and other debris from the roadway surface.

304.06.04 Rollers

304.06.04.01 General

Rollers shall be ballasted according to the manufacturer's recommendations.

304.06.04.02 Steel Drum Rollers

Steel drum rollers shall be single drum vibratory rollers according to Table 1 and shall be operated in the static mode, if the drum is not rubber coated. Drive wheels shall not mark the aggregate.

304.06.04.03 Pneumatic-Tired Rollers

Pneumatic-tired rollers shall be self-propelled and be according to Table 2. The wheels shall be mounted with smooth tread rubber tires. Tire inflation pressure shall be a minimum of 350 kPa when the tires are cold. All tires shall have equal pressure. Each roller shall be equipped with a suitable tire pressure gauge for checking tire inflation pressure.

304.06.05 Pilot Vehicle

The pilot vehicle shall be equipped according to the requirements of the OTM, Book 7.

304.07 CONSTRUCTION

304.07.01 Operational Constraints

Surface treating operations shall not be carried out when the ambient temperature at the work location is less than 10 °C or where climatic or site conditions preclude the curing of the binder.

The application of binder and aggregate shall terminate one hour before sunset.

Surface treatment shall not be carried out prior to May 15th south of a line through Pembroke, Magnetawan, and Pointe au Baril Station or prior to June 1st north of the line.

Surface treatment shall not be carried out after September 1st except with the approval of the Contract Administrator. Surface treatment may be extended to September 30th provided a high float emulsion is used.

304.07.02 Sampling

304.07.02.01 Binder

The Contractor shall provide binder field samples for testing purposes as specified in the Contract Documents.

The work shall include sampling, labelling, packaging, and delivery of samples to the laboratory designated in the Contract Documents within 5 Business Days.

Each binder sample shall consist of a minimum size of two full 4-litre samples of material. The sample containers for emulsified asphalt binder samples shall be new triple tight cans. Sample containers shall be supplied by the Contractor.

304.07.02.02 Aggregates

The Contractor shall provide aggregate samples for testing purposes as specified in the Contract Documents.

304.07.03 Determination of Binder and Aggregate Application Rates

The application rate for the binder and the aggregate shall be as specified in the Contract Documents.

The Contractor shall demonstrate to the Contract Administrator satisfactory compliance to the specified application rates of binder and aggregate. At the Contract Administrator's option, this compliance may include a minimum 300 m one lane width trial section to ensure that the binder and aggregate are applied at the specified rate.

304.07.03.01 Acceptance of Binder Application Rate

The binder application rate is acceptable when the rate of application is within a tolerance of ± 5% of the specified rate.

304.07.03.02 Acceptance of Aggregate Application Rate

The aggregate application rate is acceptable when the rate of aggregate application is within a tolerance of ± 10% of the specified rate.

304.07.04 Surface Preparation

Existing bituminous surfaces shall be clean and free of all debris and standing water before application of binder.

Where a binder is to be applied on a granular surface, the surface shall be free of standing water and shall be prepared by dampening, fine grading, and compacting immediately prior to the application of the binder. The surface shall be finish rolled to ensure a compacted smooth and float free surface.

304.07.05 Binder Application Temperatures

Binder application temperatures shall be according to OPSS 1103.

304.07.06 Application of Binder

After the surface has been prepared, the binder shall be uniformly sprayed on the road surface at the specified application rate. When binder is to be applied to two adjacent lanes, the application of binder on the initial pass shall be done without the use of an end nozzle. When binder is applied to the adjacent lane, the nozzle positioned closest to the first application of binder shall be an end nozzle.

The spray bar height shall be adjusted to ensure that there is triple lap of the binder application. At the written request of the Contractor, the Contract Administrator may allow the use of a double lap application.

Longitudinal joints shall be constructed to ensure full coverage on the centreline.

The application of binder shall terminate at the same station for both lanes at the end of each day.

All roadway appurtenances within the area to be surfaced shall be properly covered and protected immediately prior to single and double surface treatment.

304.07.07 Application of Aggregate

Aggregate shall be uniformly applied at the rate specified. The distance between the pressure distributor and the spreader shall not be more than 30 m.

If excess aggregate is present when constructing a double surface treatment, the excess shall be removed prior to the second application of binder.

304.07.08 Rolling

Immediately after spreading, the aggregate shall be rolled with a minimum of two pneumatic-tired rollers. The entire treated area shall receive two passes from each pneumatic-tired roller.

When the surface treatment is placed on a prepared granular grade, one pneumatic-tired roller shall be replaced by a steel drum roller. The entire treated area shall receive two passes from the pneumatic-tired roller and one pass from the steel drum roller.

Rollers shall be operated at such a speed as to prevent aggregate pick-up, but in no case shall the speed of rollers exceed 10 km/h.

All rolling shall be completed within 300 m of the aggregate spreader. When the combination of rollers is not sufficient to maintain the completed rate of progress, additional rollers shall be used.

304.07.09 Traffic Convoy

When specified in the Contract Documents, the Contractor shall convoy traffic according to the OTM, Book 7.

The pilot vehicle shall guide one-way traffic through or around construction. The maximum speed of the convoy shall be 30 km/h. Convoying shall be maintained until such time as the surface treatment is able to carry traffic without damage.

304.07.10 Protection of the Work

The Contractor shall repair damaged areas until such time as the work has been accepted by the Contract Administrator.

Signs indicating fresh surface treatment, or similar wording, shall be erected at the project limits and any intersections throughout the project immediately after placement of surface treatment and shall remain in place for a minimum of 72 hours.

304.07.11 Management of Excess Material

Management of excess material shall be as specified in the Contract Documents.

304.09 MEASUREMENT FOR PAYMENT

304.09.01 Actual Measurement

304.09.01.01 Binder

Binder shall be measured for payment by mass in kilograms according to the requirements of the Contract Documents.

304.09.01.02 Class 1, 2, 3, 4, 5 or 6 Aggregate

304.09.01.02.01 By Mass

Aggregate applied to the road shall be measured in tonnes according to the requirements of the Contract Documents.

304.09.01.02.02 By Volume

Measurement shall be by volume in cubic metres, loose, by predetermined truck capacities. The predetermined capacity of each truck shall be that computed from its box dimensions.

Loading of each truck shall be kept to not less than the predetermined capacity. The Contractor shall not be required to load trucks in excess of this capacity to allow for bulking, and no deduction shall be made for any settlement of the load during transportation, provided that such settlement is not caused by spillage or leakage.

Each truck shall be uniquely and readily identifiable.

304.09.01.03 Traffic Convoy

The measurement for traffic convoy shall be in hours based on the number of hours that the pilot vehicle is convoying traffic.

304.10 BASIS OF PAYMENT

304.10.01 Binder "type " - Item

Class 1 Aggregate - Item Class 2 Aggregate - Item Class 3 Aggregate - Item Class 4 Aggregate - Item Class 5 Aggregate - Item Class 6 Aggregate - Item Traffic Convoy - Item

Payment at the contract price for the above tender items shall be full compensation for all labour, Equipment, and Material to do the work.

Damaged areas requiring repair prior to the acceptance of the work shall be repaired by the Contractor at no extra cost to the Owner.

TABLE 1

Requirements for Steel Drum Rollers

Minimum Drum Diameter mm

Minimum Drum

Width mm

Minimum Static Mass per mm of Drum Width

kg

TABLE 2

Requirements for Pneumatic-Tired Rollers

Roller Class

Minimum Mass

t

Minimum Mass per Tire

kg

Appendix 304-A, Commentary for OPSS 304, November 2006

Note: This appendix does not form part of the standard specification. It is intended to provide

information to the designer on the use of this specification in a contract.

Designer Action/Considerations

The designer should specify the following in the Contract Documents:

- Class of Aggregate required. (304.05.02.01)

- Frequency and type of QA testing required. (304.07.02)

- Location of laboratory for delivery of samples. (304.07.02.01) - Application rate for the binder and aggregate. (304.07.03) - Traffic convoy requirements. (304.07.09)

The following applications are available depending on traffic volumes, status of road, and type of road surface:

- Single surface treatment is typically applied to either a primed road, a roadway with a previously applied surface treatment, or a paved road.

- Double surface treatment is typically applied to either a granular base or a primed road.

For design estimating purposes, the following application rates may be used:

Treatment Prime Single Surface Treatment

Aggregate Type Class 4

Class 1

Class 2 (Notes 2, 6) Class 4 (Note 3) Class 5 Class 6 Class 2, Note 6

Class 3 & 1

Class 3 & 4

Class 3 & 5

Class 2 & 6

Primer

CRS-2 or RS-2 HF-150S

CRS-2,HF-150S CRS-2 or RS-2

HFMS-2(ON) or HFMS-2P(ON) HF-150S (Note 4) HF-150S (Note 5)

CRS-2,RS-2 (Note 4) CRS-2,RS-2 (Note 5)

CRS-2,RS-2 (Note 4) CRS-2,RS-2 (Note 6)

CRS-2,RS-2 (Note 4) CRS-2,RS-2 (Note 5)

HFMS-2P(ON) (Note 4) HFMS-2P(ON) (Note 5)

Primer or Binder (Note 1) Grade

Range

2

kg/m1.90+/- 1.65-1.90 1.35-1.55 1.20-1.40 1.15-1.45 1.50-1.80 1.60-1.80 1.45-1.65

1.60-2.10 1.40-2.10

1.60-1.75 1.05-1.20

1.80-2.00 1.30-1.50

1.60-1.80 1.50-1.70

Typical

2

kg/m1.9 1.8 1.45 1.3 1.3 1.7 1.65 1.5 1.9 1.8 1.65 1.1 1.90 1.35 1.65 1.60

Aggregate

Typical

22

kg/mkg/m4 1

2 4 5 6 2 2 3 1 3 4 3 5 2 6

10-12 14-17 16.5-19 8-11 11-13 16-20 16-18 16.5-19

15-18 12-15 15-18 6.5-8 15-17 11-13.5

13.5-18 15-19

12 16 19 11 13 17 18 19 17 14 17 8 17 13 16 16

Double Surface Treatment

Notes:

1. Decrease binder rates towards the lower limit of the range when there is heavy commercial traffic.

2. Class 2 surface treatment may cause dust problems in urban areas.

3. Do not apply to flushed surface treatments, flushed pavements or where low friction values are a concern.

4. Initial application.

5. Second application.

6. The use of Granular A aggregate in a Single or Double Surface Treatment is not recommended.

Appendix 304-A

If a granular grade is planned to be open to traffic for a considerable length of time prior to the surface treatment operation, the designer should consider including an item for surface restoration according to OPSS 301, Restoring Unpaved Roadway Surfaces.

The designer should ensure that the Ontario Provincial Standards General Conditions of Contract and the 100 Series General Specifications are included in the Contract Documents.

Related Ontario Provincial Standard Drawings

None.


相关内容

  • 沥青瓦的施工方法
  • 施工方法 一.产品适用范围 适用于坡度从10度到90度的各式屋顶建筑如:别墅.排屋.公寓.平改坡等工程及其他特殊领域,可在木基层.水泥砂浆基层上应用,若做保温.防水层的屋面,则按相关技术规程施工. 产品型号与规格 二.设计选用要点 不同的屋面结构建议选用不同型号的瓦: 1.S3.F3适用于别墅.排屋 ...

  • 玻纤胎沥青瓦施工方案(修)
  • 多彩玻纤胎沥青油毡瓦施工方案 一.编制依据: 1.工地施工图纸 2.玻纤彩砂瓦屋面瓦安装手册 3.建筑施工手册第四版 二.工程概况: 装饰屋面部分采用的单层玻纤彩砂瓦进行施工. 该工程屋面结构节点工程做法为: 1.对钢筋混凝土屋面的要求 (1) 坡度 通常玻纤彩砂瓦(沥青瓦)用于坡度为11.3度以上 ...

  • 公路沥青路面设计规范总结
  • 公路沥青路面设计规范交流学习 <公路沥青路面设计规范>JTG D50-2006 一.术语 沥青路面:铺筑沥青面层的路面结构. 同轴载作用次数换算为标准轴载100kN相当的轴载作用次数. 的当量轴次总和. 设计弯沉值:根据设计年限内一个车道上预测通过的累计当量轴次.公路等级.路面结构类型而 ...

  • 沥青路面施工工艺
  • 沥青路面的施工工艺 1.洒布法沥青路面面层施工用洒布法施工的沥青路面面层有沥青表面处治和沥青贯入式两种,沥青表面处治是用沥青和细料矿料分层铺筑成厚度不超过3cm的薄层路面面层,通常采用层铺法施工,按照洒布沥青及铺撒矿料的层次的多少,可分为单层式.双层式和三层式三种,单层式和双层式为三层式的一部分. ...

  • 卷材防水工程施工工艺标准
  • 卷材防水工程施工工艺标准 1.3.1 总则 1.3.1.1适用范围 卷材防水是地下防水工程的一个分项工程,适用于受侵蚀性介质或振动作用的地下工程主体迎水面铺贴的卷材防水层.1.3.1.2编制参考标准及规范 (1)<地下防水工程质量验收规范>GB50208-2002(2)<地下工程防 ...

  • 2015.10.16质量知识竞赛题--路面
  • 质量知识竞赛活动题库--路面部分 一.选择题 1.级配砾石或者满足要求的天然砂砾做为路面基层时,应控制其(). A. 压实度和含水量 B.CBR值和含水量 C. 压实度和弯拉应力 D.压实度和CBR 值 2.沥青路面施工中,对级配砂砾基层应浇洒的沥青层是(). A. 粘层 B.封层C. 透层D. 防 ...

  • 种植屋面施工方案
  • 3 种植屋面 1)种植屋面的结构层次 种植屋面的构造层次一般包括屋面结构层.找平层.保温层.普通防水层.耐根穿刺防水层.排(蓄)水层.种植介质层以及植被层.此外还可根据需要设臵隔气层.隔离层等层次. 2)种植屋面各构造层次的施工 a.屋面结构层的施工 结构层为钢筋混凝土屋面,钢筋混凝土屋面既是承重结 ...

  • 道路工程监理细则
  • 青海省西宁市海湖新区文华路工程 (通海路-文博路段) 道路工程 监理实施细则 编制: 审核: 审定: 甘肃工程建设监理公司西宁分部 2007年10 月 青海省西宁市海湖新区文华路工程 (通海路-文博路)监理细则 道路工程监理实施细则 一. 道路工程监理细则编制依据 1.<市政道路工程质量检验评 ...

  • 建筑防水施工方案
  • 金洲花城四期防水工程施工方案 一.工程概况 金洲花城项目处常州市武进区邹区镇,地势平坦,交通便利.项目占地约93012平方米,沿会灵路面宽月194米,沿振中路面宽约215米,沿岳津河面宽月377米.基地被一条南北向规划道路分成大小不等的两个地块.东区为商业.小高层.高层住宅,东区入口设在规划道路上. ...

  • 沥青路面施工工艺详解
  • 沥青路面施工工艺 1.工程概况 道路结构层设计概况序号工程部位 地面行车道.匝道 1路基结构4cmSUP-13(4cm SUP 13(改性沥青)+6cm SUP)+6cmSUP-20( 改性沥青)+ )+74总厚度(cm)(新建路段).非机 8cm SUP-25(70号A级道路石油沥青)+水泥稳定碎 ...